1. AREA OF INFLUENCE
2. Identification method and assessment environmental impact
3. MEASURES OF IMPACTS ENVIRONMENTAL

Simulation: They are mathematical models to represent the structure and operation of environmental systems, exploring from a set of hypotheses and assumptions made by the actions of a Project

Networks:They are diagrams that integrate the causes of the impacts and consequences, by identifying the interrelationships between activities or actions impacted causal and environmental factors, including those representing their secondary and tertiary effects

Correction measures: They are actions to recover, restore or repair environmental conditions affected by the project.

Mitigation measures: They are actions to minimize negative impacts and effects of a project, work or activity on the environment.

Area of influence indirect: It’s understood through authorized channels and used as detours, roads used for transporting materials and debris and points where at the demand of the Management Plan Traffic signals have been installed.

Direct area of influence: It´s comprised of all areas of intervention works, all camps, storage facilities and temporary facilities and green areas adjacent to the front intervention.

Compensation Measures: They are actions to compensate to the communities, regions, localities and the natural environment by impacts or negative effects generated by a project, work or activity that can not be avoided, corrected, mitigated or replaced.

Matrices: Methods that are preliminary and very valuable qualitative to assess the various alternatives of the same Project

Checklists:It’s a simple identification method, which is used to preliminary evaluations

Prevention Measures: They are actions to avoid negative impacts and effects that can generate a project, work or activity on the environment

Mapping systems:It´s about mapping matrix-impact obtained. a superposition of the same is performed and listed undesirable impacts.